Specialist service

Project cargo and out-of-gauge shipping

Machinery, plant and oversized loads, planned properly from drawing to delivery.

Not everything fits in a standard container. We plan and ship machinery, plant, vehicles, steel structures and other oversized or heavy cargo, choosing the right equipment, arranging the permits, and managing the lifting, securing and abnormal load haulage ourselves from start to finish.

What we moveMachinery, plant, vehicles, steel, boats, modules
EquipmentFlat racks, open tops, platforms, breakbulk, ro-ro
UK haulageAbnormal loads with police and highway notifications
Start withDimensions, weight, drawings and lifting points

Project cargo is a broad term for shipments that need more planning than a standard container: goods too big, too heavy or too awkward to load in a dry box, or a set of shipments that has to arrive together for a project. It might be a single machine for a factory in the Midlands, or several loads of plant equipment for an overseas site. Either way, the work is mostly in the planning.

What counts as project cargo?

  • Out-of-gauge (OOG) cargo: too wide, too tall or too long for a standard container, such as machinery, tanks, transformers and boats
  • Heavy lift cargo: individual pieces too heavy for normal handling or road limits
  • Breakbulk: large items loaded straight onto the ship rather than in a container, such as steel beams, pipes and very large machinery
  • Ro-ro cargo: wheeled or tracked items driven on and off the ship, including vehicles, plant and items moved on roll trailers
  • Multi-shipment projects: equipment for a plant or site that must arrive in the right order and on time

Choosing the right equipment

Specialist containers and shipping methods for project cargo
OptionWhat it isTypical usePoints to know
Flat rack (20ft / 40ft)A base with end walls (fixed or collapsible), no sides or roofWide, tall or heavy machinery, vehicles, boats and steelTakes heavier loads than a dry box. Cargo can overhang the sides or top, at an extra charge
Open top (20ft / 40ft)A container with a removable tarpaulin roofTall items loaded by crane from aboveWidth is still limited by the container walls
PlatformA flat base with no end wallsVery long or wide pieces, sometimes spread across several platformsUsually loaded as part of a breakbulk-style stow
BreakbulkCargo loaded directly into the ship's hold or on deckVery large or heavy pieces beyond container limitsNeeds heavy-lift cranes or ship's gear, and careful scheduling
Ro-roDriven or towed on and off the vesselVehicles, plant, buses and cargo on roll trailersOften the simplest option for anything with wheels or tracks

As a guide, a 40ft flat rack can carry about 40 tonnes or more, depending on the model. Each carrier and vessel has its own limits for overhang and weight, so every OOG booking is confirmed case by case.

How a project cargo shipment is planned

  1. Cargo details: exact dimensions (length, width and height), weight, centre of gravity, lifting and lashing points, and drawings or photos.
  2. Method and equipment: flat rack, open top, breakbulk or ro-ro, based on the cargo, the route and the cost.
  3. Carrier approval: OOG and heavy cargo needs space and stowage approved by the shipping line before booking is confirmed.
  4. Route survey: for large loads, a check of the road route at each end for bridges, height limits, weight limits and tight turns.
  5. Permits and notifications: abnormal load notifications in the UK, and the equivalent permits at origin or destination.
  6. Loading, lashing and securing: carried out by experienced lashing crews we book and supervise, often with an independent lashing survey and certificate.
  7. Insurance: marine cargo insurance suited to the value and risk of the goods.
  8. Delivery and offloading: cranes, forklifts or skates at the delivery site, arranged in advance.

Moving abnormal loads on UK roads

In the UK, loads above certain sizes and weights count as abnormal loads. The haulier must notify the police and, in some cases, road and bridge authorities before the move. The main thresholds are:

DimensionThresholdNotice needed
WidthOver 2.9 m (standard vehicles) or 3.0 m (special types), up to 5.0 m2 working days to the police
WidthOver 5.0 m up to 6.1 mPolice notice plus National Highways VR1 permission, applied for at least 2 weeks ahead
LengthOver 18.65 m (standard) or 18.75 m (special types)2 working days to the police
WeightOver the standard limit, up to 80 tonnes gross2 working days to road and bridge authorities
Weight80 to 150 tonnes gross5 working days to road and bridge authorities, and 2 to the police
Over 6.1 m wide, 30 m long or 150 tonnesSpecial orderApplied for at least 10 weeks in advance

A summary of the police and National Highways notification rules, for guidance only. Wider or longer loads may also need escort vehicles and set travel times. Your haulier is responsible for the notifications.

Worked exampleA packaging machine from Germany to a factory in the Midlands
Cargo
7.5 m long × 3.2 m wide × 3.1 m high, 18 tonnes
Too big for a standard container?
Yes, wider and taller than a high cube door
Method
40ft flat rack, with the machine overhanging the width
Securing
Lashed to the rack by specialists, with a lashing certificate
UK road move
Over 2.9 m wide, so 2 working days' notice to the police
Offloading
Mobile crane booked at the factory for the delivery day

An illustrative example of the planning steps. Real projects are quoted on the cargo's exact dimensions, weight and route.

What affects the cost

  • Out-of-gauge surcharges: cargo that overhangs a flat rack can take up the slots of the containers next to it, which carriers charge for
  • Specialist equipment availability: flat racks and open tops are scarcer than dry boxes, especially at some origins
  • Lifting, lashing and surveys at origin and destination
  • Permits, escorts and route surveys for abnormal road moves
  • Port handling charges for heavy or OOG cargo, which are higher than for standard containers
  • Insurance for high-value or one-off equipment

Why work with us on project cargo

Our shipping line background means we know how carriers approve and stow OOG cargo, and how to get space and specialist equipment when it's scarce. We plan every step in writing before anything moves, book and manage the cranes, lashing crews and abnormal load hauliers ourselves, and stay as your single point of contact from the first drawing to final delivery. We handle project cargo on deep sea routes and across Europe.

Written by the 365 Freight team · Last reviewed . Rates, rules and schedules change, so we'll confirm the details for your shipment when we quote.
FAQs

Project cargo questions

Got another one? Ask us.

What is out-of-gauge cargo?

Cargo that's too wide, too tall or too long to fit inside a standard shipping container. It's usually shipped on a flat rack or open top container, or as breakbulk.

What is a flat rack container?

A container base with end walls but no sides or roof. Cargo can be loaded from the side or above, and can overhang the width or height at an extra charge.

Do I need a permit to move a wide load in the UK?

Loads wider than 2.9 m (or 3.0 m for special types vehicles) need advance notice to the police, and wider, longer or heavier loads need further notifications or permissions. Your haulier handles this.

What information do you need to quote project cargo?

Exact dimensions, weight, centre of gravity, lifting and lashing points, photos or drawings, the collection and delivery addresses, and the date the cargo will be ready.

Can you ship machinery in a standard container?

Often, yes, if it fits through the door and within the weight limits. We'll check the dimensions and recommend the cheapest safe option.

Struggling with a certain route?

Try 365. No job is too small for us.

Send us the route
The 365 monthly market update

Know what's coming before it hits your shipments.

One short email a month covering rates, capacity, port congestion and disruption on the trades that matter to you. No jargon and no spam.

✓ Rate & capacity outlook✓ Port & ferry disruption✓ Customs changes
I'm interested in
Unsubscribe anytime. We'll never share your details.
You're on the list.Your first update arrives at the start of next month.